The Stonecutter Tunnel (Entrance) is a limited-time premium decoration that was released on January 3, 2018, as part of The Buck Stops Here 2018 Event. It can created extra tunnels with its building job.
It returned on January 9, 2019 during theNot Yet Spring Cleaning 2019 Event,
Dialogue[]
Tunnel Creation[]
This decoration has the capacity to produce the decoration Stonecutter Tunnel with its own task; the player can start it for the amount of 2000 Cash.
Task | Cost | Rewards | Time |
---|---|---|---|
Construct Stonecutter Tunnel | 2000 | 1 15 |
3h |
Trivia[]
- Only one can be obtained.
- It can be placed on grass, pavement, dirt, beach, boardwalk, pier, edge of boardwalk, or edge of pier.
- It can also go over road, dirt road, and cobblestone road.
Gallery[]